20454 | T: Com Demolition | 05/06/2024 | DEMO BLOCK HOUSE AND WATER TANK |
19782 | T: Com Plumbing | 11/29/2023 | PVC DISCHARGE LINE |
19825 | T: Com Electrical | 11/28/2023 | WIRE EXISTING ELECTRIC HEATER |
19541 | T: Com Electrical | 11/06/2023 | RELOCATE EMERGENCY SHUT OFF |
19688 | T: Com Renovations | 10/26/2023 | ALTERATIONS IN PUMP HOUSE |
16253 | T: Com Furnace | 10/12/2021 | ISTALL GAS LINES FOR 9 NATURAL GAS FURNACES, PRESSURE TEST INSTALL REGULATORS FOR EACH FURNACE W VEN |
16031 | T: Com Electrical | 10/07/2021 | INSTALL FIRE PROTECTION TO COVER NEW STORAGE AREA |
16101 | T: Com Plumbing | 08/09/2021 | 10 GAS FURNACES W/A/C TO SERVE 1ST FLOOR |
16014 | T: Default | 07/29/2021 | NEW DEVICES TO BE TIED INTO BLDG FA SYSTEM |
15494 | T: Com Electrical | 03/19/2021 | INSTALL WIRING FOR NEW STORAGE LOCKERS, EMERGENCY LIGHTS ISTALL NEW 400 AMP SERV AND 480 VOLT LINE. |
15161 | T: Com Storage | 03/16/2021 | PHASE 3 BUILD OF STORAGE LOCKERS ON 2ND FLOOR |
15036 | T: Com Roof | 11/06/2020 | REMOVE LOOSE STONE AND INSTALL NEW INSULATION OVER 1 LAYER AND NEW TOP ROOF SYSTEM |
14813 | T: Com Electrical | 09/23/2020 | U/G PVC CONDUITS FOR SECURITY TO OUTDOOR STORAGE BUILDING |
14409 | T: Com Building | 09/01/2020 | CONSTRUCT ELEVATOR SHAFT AND NEW STAIRCASE |
E13-554 | T: Com Electrical | 08/25/2019 | INSTALL 300 8' STRIP LIGHTING |
B19-13496 | T: Res Remodeling | 08/05/2019 | REMOVAL OF 3 WALLS, NO STRUCTURAL, OLD LIGHTING AND HVAC DUCT WORK |
B12-974 | T: Com Roof | 03/25/2019 | REPLACE ROOF |
12531 | T: Com Roof | 10/30/2018 | |
12530 | T: Com Roof | 10/25/2018 | REPAIR ROOF |
B17-422 | T: Com Foundation | 12/12/2017 | LOADING DOCK FOUNDATION |
B17-300 | T: Com Tank | 09/27/2017 | 12X15 CONCRETE PAP 48 48" DEEP FOR PROPANE TANK. SOLID POUR |
B17-242 | T: Com Remodeling | 08/07/2017 | ZONING PERMIT |
B17-225 | T: Com Renovations | 07/25/2017 | ISNTALLATION OF Z ON PLAN #3 AND #4 |
B17-169 | T: Com Sign | 06/15/2017 | INSTALL A DETACHED AND AN ATTACHED SIGN - PER APPROVAL BY ZONING BOARD OF APPEALS |
E17-118 | T: Com Electrical | 06/14/2017 | INSTALL 3" PIPE FOR COMCAST WORK COMPLETED DUE TO SITUATIONS |
B17-137 | T: Com Canopy | 06/01/2017 | INSTALLATION OF PARKING CANOPY PER APPROVED SITE PLAN PER ENGINEERING AND CUT SHEETS |
E17-081 | T: Com Electrical | 05/10/2017 | WIRE BATHROOM |
M17-057 | T: Com Renovations | 05/09/2017 | INSTALL TWO MODINE HEATING UNITS IN BAY |
B17-054 | T: Com Remodeling | 04/04/2017 | METAL FRAMING FOR A BATHROOM IN HITCH BAY AREA |
B17-036 | T: Com Storage | 02/27/2017 | INSTALLATION OF PRE FAB STORAGE UNITS |
M16-173 | T: Com Install Air Conditioning | 12/28/2016 | REPLACE ROOF TOP UNITS SUPPLED BY U-HAUL - LABOR ONLY |
M16-142 | T: Com Remodeling | 11/15/2016 | REMOVE ROOF TOPS |
B16-416 | T: Com Sign | 11/14/2016 | SINGE FACE MONUMENT SIGN - 3'-8" WIDE, ILLUMINATED LED (23.83 SF) |
P16-132 | T: Com Plumbing | 10/26/2016 | PROVIDE AND INSTALL ON THE ROOF GAS LINE FOR RTUS, REPAIR THE SUPPORTS FOR GAS LINE ON ROOF |
P16-111 | T: Res Plumbing | 09/19/2016 | TEST GAS LINE FOR MAIN |
E16-198 | T: Com Electrical | 09/12/2016 | INSTALL NEW 2000 AMP SERVICE, REMOVING 13-800 TRANSFORMERS |
E16-143 | T: Com Electrical | 06/28/2016 | 200 AMP TEMORARY SERVICE TO THE OFFICE WHILE SERVICE IS REPLACED CRS#2755317 |
| T: Default | 06/20/2016 | RENOVATION |
B12-021 | T: Default | 02/07/2012 | REMOVE POLLUTED |
023088 | T: Default | 12/01/1994 | SPRINKLER IN |