BRSW-22-183 | Roof | 11/03/2022 | Tear of and re-shingling whole roof. |
HAC-22-77 | Air Conditioning | 04/28/2022 | Replace existing American Standard 3-1/2-ton A/C unit and AHU with an American Standard 3-1/2-ton He |
E-22-110 | Electrical | 04/26/2022 | Wire A/C splitb system |
HAC-22-33 | Air Conditioning | 03/01/2022 | Install (1) Mitsubishi 1.5-ton ductless system to provide A/C and supplemental heat to the enclosed |
E-22-34 | Solar | 02/02/2022 | Roof mounted pv solar array. AC disconnect next to utility meter. Rapid shutdown thru in |
18-00694 | Electrical | 08/13/2018 | WIRE GFI FOR TUB |
18-00695 | Plumbing | 08/13/2018 | REPLACE TUB |
18-00696 | Remodel | 08/13/2018 | BATH REMODEL |
17-01250 | Heating | 12/08/2017 | INSTALL RECIRC PUMP & LINE FOR HOT WATER |
17-00180 | Plumbing | 03/08/2017 | INDIRECT HOT WATER HEATER |
16-01010 | HVAC | 11/04/2016 | BOSCH HIGH EFFICIENCY PROPANE BOILER |
16-01008 | Plumbing | 10/27/2016 | RUN PROPANE LINE TO GENERATOR |
16-00969 | Plumbing | 10/20/2016 | NEW HOT WATER HEATER |
16-00970 | Electrical | 10/20/2016 | WIRE HOT WATER HEATER |
11-01019 | Repair | 10/26/2011 | REPLACE DECK & PORCH |
0035257 | Electrical | 01/29/2008 | MISC WIRING |